This project involved the removal and replacement of four existing Trojan Ultraviolet (UV) fixtures at the RM Clayton ECM-3 facility. The project included all work associated with:
- Dismantling and hauling off existing equipment
- Selecting channel demolition and modifications to the existing channels
- Constructing new channel modifications comprising concrete culverts for UV fixtures
- Erecting and rigging new Trojan UV fixtures and gates
- Demolishing electrical components and removing the existing power distribution equipment and gears
- Installing new electrical power distribution
- Making electrical modifications to existing switch gear and sensors
- Making concrete slab modifications
- Selecting new aluminum channel cover deck plates
- Pulling control wiring